The electricity estimate stayed the same. The estimate of carbon dioxide fell by nearly 19 million metric tons. Between a June preprint and the November 16 publication of a study of 403 large U.S. data centers, the authors corrected the way they assigned grid emissions to the facilities. The change lowered the central estimate from 44.6 million to 25.7 million metric tons and reversed the study’s comparison with the national grid average. [1][2][3]
What peer review found in the code
The published peer-review file shows how Reviewer 2 found the discrepancy. The manuscript described assigning electricity demand to power plants according to their shares of generation in each regional grid area. The public code instead calculated a carbon rate using electricity produced by combustion plants, then applied that higher rate to the facilities’ entire electricity demand. Generation from sources such as wind and nuclear was missing from the denominator. The authors agreed that the implementation differed from the method they had described and revised the calculations. [2]
The two estimates cover the same sample and period, May 2024 through April 2025. At the central load assumption, the team still put electricity use at 81.8 terawatt-hours, about 1.8% of U.S. consumption. The 18.9-million-ton difference amounts to a roughly 42% reduction in estimated emissions at that same electricity demand. Across the study’s different load assumptions, the published emissions estimates run from about 21 million to 31 million metric tons. [1][2][4]
How the emissions estimate changed the U.S. grid comparison
The June preprint put the facilities’ electricity-weighted carbon intensity at 545 grams of CO₂ per kilowatt-hour, above its stated U.S. average of 370. The published paper estimates 314 grams per kilowatt-hour against a U.S. average of 348, using the total-output basis. The researchers still attribute about 54% of the electricity supplying the sample to fossil fuels. Their response to reviewers says that fuel share was already based on the full generation mix. [1][2][3]
What the estimate can tell a community
The study assigns emissions using the average annual mix of regional power generation. Estimating the pollution from adding a particular campus would require evidence about which power plants would respond to the extra demand and when. Electricity volumes for the 403 facilities are modeled across operating scenarios, and the authors could neither separate AI from other computing workloads nor validate the scenarios against meter data for all 403 sites. [1][2][5]
The authors publish aggregate results that can be checked by state and grid region. Access to the underlying commercial facility file remains restricted. That leaves readers and local officials with a way to check the national arithmetic and a separate set of questions to ask about any proposed data center’s expected load, power supply and timing. [1][2][4]